C&I solar advisory

Captive, Group Captive & Open Access solar — explained

Everything a CFO or plant head needs to choose an off-site solar route in India: rules, charges, contracts and costs.

Captive Power Plant (individual)

Section 9, Electricity Act 2003 · Rule 3, Electricity Rules 2005

  • The consumer owns the plant outright (or through a 100% subsidiary) and uses the power itself.
  • Upfront: 100% of project cost, or own equity plus project debt.
  • Cross-subsidy surcharge (CSS) and additional surcharge (AS) are exempt.
  • If the plant is off-site: transmission, wheeling, scheduling charges and losses apply.
  • The owner claims depreciation (including accelerated depreciation where eligible) on its own books.
  • Term: life of the asset, about 25 years.

Group Captive Solar PPA

Rule 3, Electricity Rules 2005 (26/51 rule)

  • A developer forms a special purpose company (SPV) that builds an off-site solar plant.
  • Captive users together must hold at least 26% of the SPV's voting equity.
  • Captive users together must consume at least 51% of the plant's annual generation, in proportion to their shareholding (±10%).
  • Upfront: 26% of total plant investment, paid as equity in the SPV.
  • CSS and AS are exempt while the rules are met; failing in any year can make the full surcharge payable for that year.
  • Contracts: 25-year PPA plus Share Subscription & Shareholders' Agreement; shares bought back at exit.

Third-Party Open Access Solar PPA

Section 42, Electricity Act 2003 · Green Energy Open Access Rules 2022

  • The developer owns 100% of the plant and sells power to the consumer under a bilateral PPA.
  • Upfront: zero. Payment security through a letter of credit or bank guarantee.
  • Pays every grid charge: transmission, wheeling, losses, CSS and AS.
  • Green Energy Open Access lets consumers with 100 kW and above buy renewable power.
  • Term: typically 10 to 25 years; we offer 25 years. No plant ownership at the end.
  • Works best where grid tariffs are high and surcharges are moderate.

Side-by-side comparison

ParameterCaptiveGroup CaptiveThird-Party OA
Plant locationOn-site or off-siteOff-site solar parkOff-site solar park
Client investment100% of project cost26% of project cost (equity)Nil
Ownership100% client≥26% client equity in SPVDeveloper
CSS & additional surchargeExemptExempt if 26/51 metPayable
Transmission & wheelingPayable if off-sitePayablePayable
Minimum loadAs per state100 kW (Green OA)100 kW (Green OA)
Tenure~25 years (own asset)25 years25 years
Typical saving vs gridHighestHighModerate
Key riskCapital & O&M on own booksAnnual compliance testSurcharge & policy changes

Complete handbook: RESCO, Group Captive & Open Access

Eligibility, process, charges, terms and approvals for each model.

Rooftop RESCO / OPEX (BOOT)

Electricity Act 2003 · State rooftop / net & gross metering regulations

We build, own, operate and maintain a solar plant on your roof. You pay only for solar units at a discounted tariff and the plant is handed over to you free at the end of the term.

  • Commercial or industrial consumer (LT or HT) with a valid DISCOM connection.
  • Monthly electricity bill typically ₹5 lakh and above; sanctioned load ≥ 100 kW preferred.
  • Shadow-free rooftop of about 100 sq ft per kWp with structural capacity for ~15–20 kg/m².
  • Clear title or long-term lease of the premises covering the full PPA term.
  • Day-time load that can absorb most of the solar generation.
  • Positive credit profile: 2–3 years of audited financials, no bill payment defaults.
  • Rooftop solar capacity within state limits (often up to 100% of sanctioned load / contract demand).

Indicative guidance. Thresholds and charges vary by state and change with each tariff order; we confirm current rules before any contract.

How the landed cost is built

Landed cost = Solar tariff ÷ (1 − losses) + transmission + wheeling + other charges + CSS* + AS* + consultancy fee (₹0.50/kWh + GST)

*CSS and AS are not charged for a compliant Captive or Group Captive plant.

State open access charges (HT industrial, indicative ₹/kWh)

StateGrid tariffTransmissionWheelingLossesCSSASBanking
Maharashtra
MERC · MSEDCL
10.500.420.643.8%1.611.25Monthly banking, 8% charge in kind
Gujarat
GERC · GUVNL
8.200.380.223.5%1.480.40Daily banking with charges per unit
Karnataka
KERC · BESCOM
9.000.450.504%1.850.00Annual banking (subject to KERC orders)
Tamil Nadu
TNERC · TANGEDCO
8.500.400.214.5%1.720.00Monthly banking for solar
Haryana
HERC · DHBVN / UHBVN
8.800.320.684.2%1.551.10Monthly banking
Rajasthan
RERC · JVVNL / AVVNL / JdVVNL
8.600.350.604.5%1.400.90Monthly banking
Uttar Pradesh
UPERC · UPPCL
9.200.400.755%1.650.80Monthly banking
Madhya Pradesh
MPERC · MPPKVVCL
8.900.360.554.5%1.500.60Monthly banking
Telangana
TGERC · TGSPDCL
9.000.380.604.5%1.700.60Monthly banking
Andhra Pradesh
APERC · APSPDCL
8.900.400.554.5%1.600.50Monthly banking

Benchmarks for planning only. Charges are revised by each state commission every year — we confirm current figures before any proposal.

Group Captive compliance checklist

  • Hold ≥26% voting equity in the SPV throughout the year.
  • Consume ≥51% of annual generation (all captive users together).
  • Keep your consumption in proportion to shareholding (±10%).
  • Submit annual verification to the state nodal agency / DISCOM.
  • Sign PPA, SSHA and open access / wheeling agreements.

Documents we need from you

  • Last 12 months' electricity bills (all meters).
  • Sanctioned / contract demand and connection voltage.
  • Company KYC, board resolution and audited financials.
  • 15-minute load profile, if available.

See which route saves you the most

Upload your bills and pick your state for a side-by-side comparison and PDF.

Compare my options