Intelligent Solution Finder
Illustrative case — not actual project data. Edit any fact.
The open-access sheet labels its columns “FY25-26, FY25-27, FY25-28…”. These appear to be typos; the second column is used as FY 2026-27.
Annual consumption
6.21 GWh
Annual electricity bill
₹7.84 Cr
Per flat / month
1174 kWh
Common areas / year
570 MWh
Recommended structure
ConditionalSociety owns ≥26% of an off-site plant and wheels power to members.
Conditional: Electricity (Amendment) Rules, 2026 — legal review must be resolved before this recommendation is relied on.
All structures, ranked
| # | Structure | Eligibility | Coverage | Savings / yr | Score |
|---|---|---|---|---|---|
| 1 | Group Captive Solar (off-site) | Conditional | 90.0% | ₹5.23 Cr | 66 |
| 2 | Virtual Net Metering | Conditional | 90.0% | ₹5.23 Cr | 40 |
| 3 | Rooftop Net Metering (common areas) | Permissible | 2.6% | ₹19.9 L | 37 |
| 4 | RESCO Rooftop (zero capex) | Conditional | 2.6% | ₹11.9 L | 13 |
| 5 | Third-party Green Open Access | Conditional | 8.3% | ₹18.7 L | 2 |
Eligibility & compliance tests
Legal status of the society
Registered cooperative society — ownership and consumption tests are satisfied collectively by members.
Captive ownership ≥ 26%
Captive users hold 30% of the plant (holdings of subsidiaries and holding companies in one corporate group may be aggregated).
Captive consumption ≥ 51% of generation (percentage unverified)
Members would consume 100% of generation during the financial year. If this test fails, the whole year's generation is treated as non-captive.
Green energy open access load threshold
Captive consumers are not subject to the 100 kW load limit.
Plant location and transmission route
Plant in Maharashtra — intra-state open access; captive verification by the state-designated nodal agency.
Electricity (Amendment) Rules, 2026 — legal review
Substituted Rule 3 is applied, but its library entries await legal review and the consumption-test percentage is unverified.
Risk analysis
Charges per unit
| Avoided licensee tariff | ₹12.64 |
Wheeling charge | −₹2.40 |
Transmission & banking charges | −₹0.60 |
Cross-subsidy surcharge Not levied on captive use | −₹0.00 |
Additional surcharge Not levied on captive use | −₹0.00 |
| Net value per kWh | ₹9.64 |
Approval sequence
General body resolution approving investment and structure
Society / Registrar of Cooperative Societies
Acquire ≥26% ownership in the generating plant
Society & developer
Connectivity for the generating plant
STU / licensee
Green energy open access application
Designated GEOA portal / nodal agency
Energy accounting & metering at each drawal point
Licensee / MSLDC
Annual captive declaration and status verification
State-designated nodal agency
Automatic compliance checklist
Decision support only. Ambiguous or high-risk interpretations require review by a qualified legal professional.